I am trying to set up an overseeding schedule, which I had prior to me pausing it today to mow and the app is saying that there is a conflict for 2022/11/30, when I have the overseeding schedule to stop on 2022/10/24. AND it is only on one zone.

Very frustrating.

    More information about those two schedule would be helpful.

    • Dhk replied to this.

      Crabgrass

      jhhaller So I have set a schedule named summer, zone1,2,3,4,6 included. watering before sunrise and 1 minute for each zone. Just a few days ago, I was planning on weeding, so I set another schedule named overseeding, only zone 5 included. But I get the schedule conflict pop-up box. How??? zone5 was not included in summer, HOW???

        Dhk Calm down, bro. That's not the point, the schedule conflict alert box pops up when there is a conflict between the execution times of two schedules. It has nothing to do with whether the zones overlap or not. There must be some other problem.

        Really? I misunderstood?

        Yeah, you do misunderstand it. Check your water date and time.

        Ok, it runs at 22:30 and last for 5 minutes.

        Weird, What about the frequency of watering.

        Are that matters? I set it to run every hour.

          Dhk Okay, Case solved. You set the schedule hourly interval. Then after the scheudle runs for a while, there is an overlap in the running time of the two scheudles, which is why the schedule conflict pop-up is displayed.

          Oh my god, YOU are absolutely right. That' the reason with no doubt. Thank you bro